| Task Name | Dataset Name | SOTA Result | Trend | |
|---|---|---|---|---|
| Quadratic Assignment Problem | Geometrically Structured synthetic datasets n=100 | Solution Cost1,591.23 | 13 | |
| Quadratic Assignment Problem | Geometrically Structured synthetic datasets (n=50) | Cost375.48 | 13 | |
| Quadratic Assignment Problem | Geometrically Structured synthetic datasets n=20 | Solution Cost54.37 | 13 |