| Task Name | Dataset Name | SOTA Result | Trend | |
|---|---|---|---|---|
| Transportation Network Design Optimization | Transportation Network 3-node NV=48, NC=24, NZ=126 | Runtime (s)20 | 4 | |
| Transportation Network Design Optimization | Transportation Network 9-node NV=2,262, NC=678, NZ=6,222 | Runtime (s)727 | 3 |