Share your thoughts, 1 month free Claude Pro on usSee more
WorkDL logo mark

Flexible Job Shop Scheduling via Dual Attention Network Based Reinforcement Learning

About

Flexible manufacturing has given rise to complex scheduling problems such as the flexible job shop scheduling problem (FJSP). In FJSP, operations can be processed on multiple machines, leading to intricate relationships between operations and machines. Recent works have employed deep reinforcement learning (DRL) to learn priority dispatching rules (PDRs) for solving FJSP. However, the quality of solutions still has room for improvement relative to that by the exact methods such as OR-Tools. To address this issue, this paper presents a novel end-to-end learning framework that weds the merits of self-attention models for deep feature extraction and DRL for scalable decision-making. The complex relationships between operations and machines are represented precisely and concisely, for which a dual-attention network (DAN) comprising several interconnected operation message attention blocks and machine message attention blocks is proposed. The DAN exploits the complicated relationships to construct production-adaptive operation and machine features to support high-quality decisionmaking. Experimental results using synthetic data as well as public benchmarks corroborate that the proposed approach outperforms both traditional PDRs and the state-of-the-art DRL method. Moreover, it achieves results comparable to exact methods in certain cases and demonstrates favorable generalization ability to large-scale and real-world unseen FJSP tasks.

Runqing Wang, Gang Wang, Jian Sun, Fang Deng, Jie Chen• 2023

Related benchmarks

TaskDatasetResultRank
Flexible Job Shop Schedulingla Hurink benchmark
Objective Value934.8
35
Flexible Job Shop SchedulingFJSP-1200 (10, 20, 60) DANIEL distributions (test)
Time (s)10
18
Flexible Job Shop SchedulingFJSP-2000 (10, 20, 100) DANIEL distributions (test)
Time (s)16
18
Flexible Job Shop SchedulingFJSP-600 (10, 20, 30) DANIEL distributions (test)
Time (s)4
18
Flexible Job Shop SchedulingFJSP-800 (10, 20, 40) DANIEL distributions (test)
Time (s)6
18
Flexible Job Shop Schedulingmk Brandimarte
Makespan180.8
18
Flexible Job Shop SchedulingSD2 40 x 10
Objective Value953.1
17
Flexible Job Shop SchedulingSD1 10 × 5
Optimality Gap5.55
17
Flexible Job Shop SchedulingSD1 20 × 5
Optimality Gap2.46
17
Flexible Job Shop SchedulingSD1 15 × 10
Optimality Gap6.75
17
Showing 10 of 20 rows

Other info

Follow for update